Monday, September 19, 2011

Tank and plumbing

 The tank has finally been installed - and it's big! Gutters plumbed to tank, tank to pump, pump to cabin and cabin to worm waste water system, which also needed an electrician to make three power points for it (two pumps, one outside to stop the septic tank floating up, and an alarm for if the inside pump stops working).

No comments:

Post a Comment